Hardwood decking joists review: Ipe 40 x 60 mm joists on weed membrane at 40 cm centres, with the first boards fixed at the back
What convinces us
One timber from top to bottom. Ipe boards on Ipe joists move together. You avoid different timbers working against each other, and the screws are under less strain.
Lasts as long as the boards. A subframe that rots after ten years means lifting the whole deck. With class 1 Ipe that does not happen, even close to the ground.
Ground contact is fine. Ipe is suitable for ground contact without treatment, so the joist can sit low on foundation posts.
Little movement. Ipe has the lowest tangential shrinkage of the outdoor timbers we compare. The joist stays straight, and so does your deck.
Handy length. Three metres gives a calm subframe and still fits in an ordinary trailer.
The downsides
Always pre-drill. Ipe is so hard that a screw can snap or the timber can split without a pilot hole. Allow extra time.
Cutting needs good tools. Ipe blunts blades quickly. Use carbide and dust extraction, as the sawdust can irritate the skin.
One size only. We supply this joist in 40 x 60 mm at 3.00 m. For other lengths you cut it down or join it over a post.
Can bleed. Ipe contains a dye that dissolves in water. Light paving can show some staining at first.
Not a budget joist. Treated softwood joists are cheaper to buy. Under a deck meant to last 25+ years we think that is the wrong saving.
Questions about the build or joist spacing? Call us on +49 2821 7483051.
Who it suits, and who it suits less
A good fit for
Anyone laying Ipe decking boards who wants a subframe with the same lifespan.
A low deck close to the ground, on foundation posts.
Hidden clip fixing: the clip is screwed into the joist.
Less suitable for
Anyone who wants to work fast without pre-drilling.
Anyone after an aluminium or composite subframe.
A build where the lowest price comes first.
Comparison: joist or foundation post
Joists and posts work together. The post goes into the ground, the joist sits on it and carries the boards. So you need both, unless your deck sits on a solid base.
Our advice: space the joists 40 to 45 cm apart, centre to centre. Drive in at least 2 posts along every metre of joist and screw the joist to them. Always lay weed membrane under the deck. Fix the boards with black coated stainless steel clips and screws, with an 8 mm gap. Prices on 4 November 2026.
Ipe decking joist with hidden clip: black coated clip in the groove of two Ipe boards, screwed into the joist
Use the same timber as your boards. Under Ipe decking boards, that means Ipe joists. The frame and the deck then move together and the frame lasts just as long: 25+ years.
What joist spacing for hardwood decking?
We advise 40 to 45 cm centres. That keeps 21 mm boards from flexing. Closer spacing makes the deck even stiffer, but you need more joists.
Do you need to pre-drill Ipe?
Yes, always. Ipe is very hard. Without a pilot hole the screw can snap or the timber can split. Use our decking screws with a drill point.
The more you order, the more you save on delivery costs.
✅ Shipping in 2 days. Delivery time between 7 to 14 working days.
Free delivery in the UK from £4300.
Up to £4300 delivery charge of £250.
Promotion & information
* We always supply a construction kit. This means that you must cut and install all materials yourself.
* If you have ordered a fence, all fastening materials will be supplied, including clips and screws. The hardwood fence posts and all ipe slats are also included in the package.
* If you have ordered decking, all clips and screws are also supplied free of charge.
-> Important: do not forget to oil the wood on all four sides and do not leave unassembled wood (including during assembly) in the sun (purchase oil from us or treat with a similar product). Wood that has been screwed together correctly will almost never warp due to the clamping. Read carefully how to process wood on our website. This will prevent problems and allow you to enjoy your purchased product for a long time.